All news

Jacksonville 01 breaks ground on the First Coast

June 24, 2026 · Water Credit Registry

Our next flagship station is being built in Jacksonville, Florida, generating potable water on site and metered into the public ledger from day one.

Jacksonville 01, our next flagship atmospheric water generation station, is under construction on the Florida First Coast. The station will produce potable water directly on site, with output metered, countersigned, and minted as Water Credits on the public ledger.

A Florida flagship

Jacksonville is the anchor for a broader Florida corridor that runs down through St. Augustine, Tampa, and Boca Raton. A station on the First Coast turns a fast growing metro from a net draw on the aquifer into a producer of verified, replenishing supply.

Built for the coast

The site was chosen because its climate is a proving ground for humid coastal generation at scale. If a station can produce reliably under Florida heat and storm cycles, the rest of the Gulf and Southeast siting map opens up.

1,024,000 gallons of projected first-year output

Once online, live output from Jacksonville 01 will stream into the Registry alongside every other registered station. Anyone can watch it produce in real time; anyone can buy the credits it mints.